Carpenter secured with a harness during a tiled-roof renovation

Roof renovation · Slagelse and Zealand

A new roof needs to last. Even where you cannot see it.

We renovate the entire roof — from the supporting structure and roof underlay to insulation, flashings and the finished roof covering.

Call me back

Need a hand?

We will call you back promptly during working hours, or as soon as possible afterwards.

Kenn receives an SMS immediately.

This site is protected by reCAPTCHA and Google’s Privacy Policy and Terms of Service apply.

01

The structure comes first

Structure, weather-tightness and finish are considered together. Rafters, battens and roof underlay are assessed before the new roof covering is closed in.

02

Weather-tight at every junction

You know the solution, materials and reservations. The ridge, eaves, chimneys and flashings are treated as critical details.

03

Asbestos assessed before work begins

You know who is responsible throughout the project. Older roof sheets are examined, and any removal is planned in advance.

04

Thorough handover

A proper handover. Materials, visible finishes and relevant reservations are reviewed with you.

More than new roof tiles

The finished roof is only as good as the work beneath it.

A roof renovation begins with understanding the existing house. The age of the roof tells us something, but not everything. Damp, ventilation, insulation and the structure must be assessed as a whole.

That is why we do not start by selling you a particular type of roof. We start by finding out what the house actually needs — and whether a complete replacement is the right solution at all.

Finished black tiled roof on a brick house in Haslev
Existing roof structure viewed from the loft in Sorø

The entire structure

We look at everything from ridge to gutter.

  1. 01Roof structure

    Rafters, battens and timberwork are assessed before they are enclosed.

  2. 02Roof underlay and ventilation

    The details must direct moisture out and keep water away.

  3. 03Insulation

    We clarify the options based on the way the house is constructed.

  4. 04Openings and penetrations

    Chimneys, dormers, windows, the ridge and the eaves require precision.

  5. 05Roof covering

    The material is selected to suit the house, its appearance and the maintenance requirements.

Repair or a new roof?

A single problem does not always require a completely new roof. Recurring problems often do.

01

Leaks and signs of damp

Discolouration, damp or water ingress may come from the roof covering, joints or damaged roof underlay.

02

Deteriorated roof tiles or sheets

When many tiles or sheets have deteriorated, ongoing replacements can become an expensive short-term solution.

03

Worn flashings

Problems at the ridge, eaves, chimneys or flashings may indicate that several parts of the roof have reached the end of their service life.

04

Damp in the structure

The cause must be found before the roof is closed up again. Otherwise, the problem is simply hidden.

05

Recurring repairs

When the faults keep appearing in different places, it is time to compare several patching solutions with a complete renovation.

We will tell you if a repair is sufficient. And if a complete renovation is the most durable solution, we will explain why.

Roofing work in practice

Large surfaces. Small tolerances.

A roof is viewed from a distance, but it is made weather-tight in the detail. The joints, finishes and sequence of the work determine the quality.

Uniform lines and secure overlaps are a visible result of the technical work.

The ridge, eaves and flashings take time. That is not where we rush.

Black roof surface with corrugated sheets overlooking the open countryside Carpenter secured with a harness during the renovation of a tiled roof
Cordoned-off roofing work with scaffolding during the controlled removal of asbestos-containing roof sheets

Older roof sheets

Asbestos must be assessed before work begins.

On older roofs, roof sheets or other building materials may contain asbestos. This must not come as a surprise in the middle of the project.

Tømrerfirmaet Kenn is authorised to carry out asbestos removal. We can therefore plan the assessment, removal and subsequent roof construction together as one coherent plan.

Read about authorised asbestos work

A clear process

You should be able to follow the decisions all the way through.

Roof renovations often involve hidden conditions. A clear process makes them easier to manage without loose assumptions or unclear additional charges.

  1. 01

    Assessment

    We inspect the roof covering, access, structure and visible signs of damage.

  2. 02

    Quotation

    You receive a clear scope of work, choice of materials and the reservations that are actually relevant.

  3. 03

    Planning

    Scaffolding, safety, deliveries and the sequence of work are coordinated before we open up the roof.

  4. 04

    Work

    We keep you informed and assess hidden conditions before the work continues.

  5. 05

    Handover

    We review the work and the important details with you.

Because a roof is no place for half-explanations.

01You should understand what you are buying and why the solution suits your particular house.

02Hidden conditions are part of renovation work. They must be described and dealt with — not glossed over to make a sale.

03Materials, maintenance and details are chosen with many years of Danish weather in mind.

Briefly tell us what you are experiencing and where the house is located. Then we can have a professional conversation about what makes sense from here.

Next step

Ready for a specific conversation?

Tell us what you’re considering and how far you’ve got. We’ll get back to you within 24 hours.

Describe the project